Reliability evaluation index for the integrated supply chain utilising BIM and lean approaches
Autor(en): |
Jingxiao Zhang
Hui Li Hamed Golizadeh Chuandang Zhao Sainan Lyu Ruoyu Jin |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Engineering, Construction and Architectural Management, 2020, n. 5, v. 27 |
Seite(n): | 997-1038 |
DOI: | 10.1108/ecam-12-2018-0542 |
Abstrakt: |
PurposeThis research aims to develop an approach to assess the reliability of integrated construction supply chainsviaan integrated model of building information modelling (BIM) and the lean supply chain (LSC). It reflects the synergistic workflow between BIM and LSC as a novel approach to improve the reliability of construction projects. Design/methodology/approachThis research evaluates the reliability of the BIM-LSC approach through a combination of entropy theory, set pair analysis (SPA), and Markov chains (EESM). An exploratory survey was conducted to collect data from 316 industry professionals experienced in BIM and LSC. Subsequently, multiple cycles of calculations were performed with indirect data inputs. Finally, a reliability evaluation index is established for the BIM-LSC approach and potential applications are identified. FindingsThe results show that the EESM model of BIM-LSC developed in this study can handle not only supply chain reliability evaluation at a given state but also the prediction of reliability in supply chain state transitions due to changing project conditions. This is particularly relevant to the current environment of the construction project, which is characterised by an increasing level of complexity in terms of labour, technology, and resource interactions. Research limitations/implicationsFuture research could consider the accuracy and validity of the proposed model in real-life scenarios with by considering both quantitative and qualitative data across the entire lifecycle of projects. Practical implicationsThe research offers a model to evaluate the reliability of the BIM-LSC approach. The accuracy of BIM supply chain reliability analysis and prediction in an uncertain environment is improved. Originality/valueThe BIM-LSC reliability evaluation and prediction presented in this study provides a theoretical foundation to enhance understanding of the BIM-LSC in the construction project context. |
- Über diese
Datenseite - Reference-ID
10576916 - Veröffentlicht am:
26.02.2021 - Geändert am:
26.02.2021