0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Civil Engineering Magazine, , n. 7, v. 56
Seite(n): 41
Abstrakt:

Redecking the Golden Gate Bridge with a light weight orthotropic steel plate deck left the 49 year old monument 11,000 tons lighter, 2 feet wider, and ready to carry traffic for the next 100 years. By day, workers prepared for the night crew, which sawed out existing deck sections and placed the new prefabricated units. Sidewalk sections were also removed but were rebuilt and replaced. The work took 401 nights, and contractors were assessed heavy penalties for lingering beyond 5:30 a.m., when the closed lanes had to be reopened to full traffic. An OCEA Special Citation for outstanding achievement in infrastructure rehabilitation.

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen.
  • Über diese
    Datenseite
  • Reference-ID
    10015696
  • Veröffentlicht am:
    26.07.2004
  • Geändert am:
    14.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine