0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

A real‐time hybrid simulation method based on multitasking loading

Autor(en): (School of Architecture & Civil Engineering Heilongjiang University of Science & Technology Harbin 150022 China)
(School of Architecture & Civil Engineering Heilongjiang University of Science & Technology Harbin 150022 China)
ORCID (School of Civil Engineering Harbin Institute of Technology Harbin 150090 China)
(School of Civil Engineering and Architecture Wuhan University of Technology Wuhan 430070 China)
(School of Architecture & Civil Engineering Heilongjiang University of Science & Technology Harbin 150022 China)
(School of Architecture & Civil Engineering Heilongjiang University of Science & Technology Harbin 150022 China)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Structural Design of Tall and Special Buildings, , n. 14-15, v. 32
DOI: 10.1002/tal.2045
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/tal.2045.
  • Über diese
    Datenseite
  • Reference-ID
    10734760
  • Veröffentlicht am:
    03.09.2023
  • Geändert am:
    18.09.2023
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine