Queenstown Bay Reservoir, New Zealand
Autor(en): |
A. J. O'Leary
J. W. P. Hadley J. E. Mason |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Structural Engineering International, August 1997, n. 3, v. 7 |
Seite(n): | 186-187 |
DOI: | 10.2749/101686697780494789 |
Abstrakt: |
The Queenstown Bay Reservoir project is part of a major regional infrastructure upgrade in a hilly resort residential area. The project was tendered on a design-and-construct basis and the successful tender was a joint submission from a contractor and a design engineering office. It was a requirement of the contract that the water supply to the town be maintained at all times during construction of the new storage. The new reservoir replaces two 450 m³ reservoirs on the site and will allow water supply and storage demands to be met to the year 2020. It will provide 8,600 m³ of storage when both stages are completed in December 1997. The reservoir is a water-retaining structure of unconventional geometry that has undergone specific design and concept development to accommodate challenging site constraints and two-stage construction. |