0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

The Pre-Adoption Evaluation Method for Environmental Protection#

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Open Construction and Building Technology Journal, , n. 1, v. 9
Seite(n): 192-199
DOI: 10.2174/1874836801509010192
Abstrakt:

Urban planning is the space expression of urban resource configuration. Its central goal is using the effective resource with the lowest ecological cost in exchange for the greatest economic benefits. The current city’s expansion which is dominated by the development, is too fast, which has overlooked the balance between planning and environmental protection. The contradiction between urban development and environmental protection is becoming more and more acute. In the current urban planning practice, planning is required due to lack of effective analysis and evaluation for environmental problems. Related researches regard "environmental impact assessment (EIA)" as the central content of the planning. The article summarized some methods of "the pre-adoption evaluation" that are related to environmental impact assessment; and try to put forward the basic train of thought which is according to "the pre-adoption evaluation" for urban planning.

Copyright: © 2015 Xv Xiaoyan, Dao Lu
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10381345
  • Veröffentlicht am:
    22.11.2019
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine