Planning Construction Execution in the Engineering Pre-Construction System

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering Structures and Technologies, , n. 3, v. 3
Seite(n): 123-135
DOI: 10.3846/skt.2011.14
Abstrakt:

The article analyzes an efficient method for planning the execution of construction work. Construction companies are looking for ways to reduce the essential factors in executing the construction work project, i.e. cost and time influencing the forthcoming company's operating results are offered to perform engineering pre-construction activities. Engineering pre-construction is a set of technical, legal, economic, technological and organisational measures that shall ensure a consistent start of construction and a rhythmical organisation of major construction works employing optimum technology. Engineering pre-construction provides great potential for working out rational design solutions with respect to the execution of construction works applying a range of methods for assessing the aforesaid solutions. In this case, mathematical methods play the main role. Mathematical methods enable more effective tackling of the execution issues of construction works as well as developing rational design solutions with respect to the execution of construction works (Janušaitis, Juodis 2001; Juodis, Apanaviciene 2003; Viliuniene, Juodis 2002; Malinauskas, Kalibatas 2005; Viliūnienė, Viliūnas 2005; Viliuniene, Viliunas 2007; Žiogas, Juočiūnas 2005; Janusz, Kapliński 2006; Zavadskas et al. 2009; Šiškina et al. 2009; Medeliene, Ziogas 2010). Practical implementation of such solutions in the course of executing construction works would allow cutting down construction costs and construction time by 15–25% and 16–25% respectively (Viliūnienė, Viliūnas 2005). Besides, the rapid development of computer technology enables both faster preparation of rational design solutions to construction works through the application of mathematical methods and integration thereof into special software packages designed for construction management. Therefore, contractors should realise the significance of engineering pre-construction that is especially important to the execution of expensive large-scale projects. The process of construction execution should be improved applying the project management technique that helps to achieve the set goal within a limited time and with the optimum usage of limited resources. The objective of project management is to plan, organise and control project resources in order to implement the goals of the project. Hence, engineering pre-construction should be considered as an individual construction project stage acting as an engine for planning construction execution, organisation and control, thereby enabling a construction company to focus on profitable results. The article presents the methodology for preparing design solutions to the execution of construction work, which is adapted to handle the practical issues of engineering a pre-construction stage. The execution of complex earth works has been chosen as the subject matter of research.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3846/skt.2011.14.
  • Über diese
    Datenseite
  • Reference-ID
    10326058
  • Veröffentlicht am:
    21.07.2019
  • Geändert am:
    21.07.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine