Performance Evaluation on Selection of Formwork Systems in High Rise Buildings Using Regression Analysis and Their Impacts on Project Success

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Archives of Civil Engineering, , n. 2, v. 65
Seite(n): 209-222
DOI: 10.2478/ace-2019-0029
Abstrakt:

The selection of the formwork system for high rise building affects the entire construction project duration and cost. The study reports the factors influencing the selection of different formwork system in the construction of high rise buildings through structural questionnaire survey from the client, contractor, consultant, and interviews with expert members. Total of 40 technical factors was identified from the literature and 220 filled questionnaires were received from the respondent. Relative Importance Index method is used to find the topmost factors affecting the selection of formwork system. Additionally, from factor analysis 22 factors were identified to have a correlation with one another. Regression analysis reveals that duration of the project, maintenance cost, adaptability, and safety have impact on formwork selection across time, cost and quality. These findings could potentially increase the construction company’s existing knowledge in relation to formwork selection.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.2478/ace-2019-0029.
  • Über diese
    Datenseite
  • Reference-ID
    10378750
  • Veröffentlicht am:
    10.11.2019
  • Geändert am:
    10.11.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine