0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Optimization Study on Enterprise Production Plan Based on Genetic Algorithm

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Open Construction and Building Technology Journal, , n. 1, v. 9
Seite(n): 127-130
DOI: 10.2174/1874836801509010127
Abstrakt:

This article aims at solving the common issues on enterprise production plan, based on combining JIT production idea and actual product characteristic, to establish an optimized production plan model, with advanced and delayed production as the least ambition and with the availability of the enterprise equipment and order quantity as constraint conditions. Meanwhile, GA is used to solving the optimization model, and is used in the practical cases, so that the production plan of the minimum cost is attained. The model has a great guiding significance on the decrease in the enterprise production cost, the development of the use ratio of equipment and the rapid production planning.

Copyright: © 2015 Liu Haidong, Peng Lixia, Li Qin
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10381407
  • Veröffentlicht am:
    22.11.2019
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine