0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Optimization of resource leveling problem under multiple objective criteria using a symbiotic organisms search

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Civil Engineering Dimension / Dimensi Teknik Sipil, , n. 1, v. 21
Seite(n): 43-49
DOI: 10.9744/ced.21.1.43-49
Abstrakt:

Bad scheduling and resource management can cause delays or cost overruns. Optimization in solving resource leveling is necessary to avoid those problems. Several objective criteria are used to solve resource leveling. Each of them has the same objective, which is to reduce the fluctuation of resource demand of the project. This study compares the performance of particle swarm optimization (PSO) and symbiotic organisms search (SOS) in solving resource leveling problems using separate objective functions in order to find which one produces a better solution. The results show that SOS produced a better solution than PSO, and one objective function is better in solving resource leveling than the others.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.9744/ced.21.1.43-49.
  • Über diese
    Datenseite
  • Reference-ID
    10322257
  • Veröffentlicht am:
    12.07.2019
  • Geändert am:
    06.08.2019
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine