0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Operation of 2+1 Road with High Shares of Heavy Vehicles

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Archives of Civil Engineering, , n. 3, v. 63
Seite(n): 53-70
DOI: 10.1515/ace-2017-0028
Abstrakt:

The author investigated traffic flow quality on a new 2+1 long road bypass with an exceptionally high share of heavy vehicles in order to assess rational limits of heavy vehicle shares in traffic flow, dependent on the length of the 2+1 road and the number of passing segments in each direction. This paper presents the results of traffic flow quality analyses through the use of empirical and simulation methods for a single 2+1 road segment with additional passing lanes, as well as for the study of the entire section of the bypass - 2+1 road. Variables include analysis of travel speed distribution, platoon traffic, and amount of passing maneuvers. Results show that large passing demands lead to very high speeds (over 100 km/h) on segments with additional passing lanes. The conclusions include remarks related to the use and operation of 2+1 cross-sections with high shares of heavy vehicles.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1515/ace-2017-0028.
  • Über diese
    Datenseite
  • Reference-ID
    10476776
  • Veröffentlicht am:
    25.11.2020
  • Geändert am:
    25.11.2020
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine