A multi-dimensional joint confidence limit approach to mixed mode planning for round-the-clock projects

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 1, v. 24
Seite(n): 40-60
DOI: 10.1108/ecam-10-2015-0165
Abstrakt:

Purpose

Good planning is key to good project performance. However, for the sub-class of round-the-clock projects requiring mixed mode planning a suitable planning approach does not exist. The purpose of this paper is to develop and validate such an approach.

Design/methodology/approach

Development of the approach builds on a synthesis and extensions of previous work related to projects with round-the-clock schedules, containing multiple workflows (sequential/cyclical). This approach considers the interdependence among shift-schedule, productivity, calendar duration, and risk registers. It quantifies the confidence in those strategies using a Monte Carlo and a multi-dimensional joint confidence limit (JCL) simulation platform.

Findings

nof workflows and their interdependencies. Also, the platform results show that the deviation between the deterministic outcomes and the simulated ones are a good indicator when dealing with projects with minimal tolerance for possible imposed mitigation strategies (e.g. round-the-clock projects).

Research limitations/implications

The validation of the approach is limited to a multi-billion dollar nuclear refurbishment case study and functional demonstration. The applicable class of projects is limited, and includes those for which failure of cost, schedule, or quality implies project failure.

Originality/value

It is anticipated that the proposed approach will assist with developing a realistic planning strategy by incorporating various factors and constraints under the impact of risks and uncertainty. This may lead to a more reliable determination of outcomes for round-the-clock projects.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-10-2015-0165.
  • Über diese
    Datenseite
  • Reference-ID
    10576548
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine