A Multi-Criteria Decision-Making Model for Selecting the Best Project Delivery Systems for Offsite Construction Projects
Autor(en): |
Mohamed Assaf
Mohamed Hussein Sherif Abdelkhalek Tarek Zayed |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Buildings, 14 Februar 2023, n. 2, v. 13 |
Seite(n): | 571 |
DOI: | 10.3390/buildings13020571 |
Abstrakt: |
Off-site construction (OSC) is an innovative construction method that transfers most of the site-based work to a more controlled environment. Construction waste minimization, speedy schedules, higher sustainability, and better quality are some of the perceived benefits of OSC. Therefore, significant research attention has been given to OSC. However, minimal research attention has been given to procurement management in OSC, which could impact its pace of adoption. Existing studies on the procurement methods of OSC projects have overlooked several criteria related to OSC that impact the selection of the appropriate procurement methods (i.e., design-build, construction management, etc.). In addition, the literature lacks decision-making tools to assist OSC practitioners in selecting the appropriate procurement method. In this regard, this study contributes to the body of knowledge by (1) identifying the criteria that impact the selection of OSC procurement methods; (2) developing a multi-criteria decision-making (MCDM) model to select the appropriate OSC procurement methods. The developed MCDM model uses a hybrid approach of analytic network process (ANP) and evidential reasoning (ER). The ANP, which considers the interdependencies among the collected OSC procurement criteria, is used to calculate the relative importance weights through questionnaire surveys. The ER method evaluates various OSC procurement methods in accordance with the criteria importance weights. The results indicate that project quality, cost control, and funding arrangement are the prominent selection factors. On the other hand, the model reveals that the integrated project delivery (IPD) and construction management (CM) methods have the highest utility scores. The MCDM model has been validated by comparing the results with similar studies. The present study could assist OSC practitioners in selecting the appropriate procurement method for OSC projects. |
Copyright: | © 2023 by the authors; licensee MDPI, Basel, Switzerland. |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
5.79 MB
- Über diese
Datenseite - Reference-ID
10712600 - Veröffentlicht am:
21.03.2023 - Geändert am:
10.05.2023