The Methodology of Using Value Engineering in Construction Projects Management
Autor(en): |
Kaveh Miladi Rad
Omid Aminoroayaie Yamini |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Civil Engineering Journal, Juli 2016, n. 6, v. 2 |
Seite(n): | 262 |
DOI: | 10.28991/cej-030986 |
Abstrakt: |
Construction projects are implemented in different countries with heavy costs and some of the projects have been relatively or absolutely unsuccessful and even faced with irreversible losses after construction. Maybe, it is due to complexities related to projects or other social-economic phenomenon. The present study revealed that value engineering can be used as a helpful tool from the beginning of studies to the end of designing, constructing, exploiting, and maintaining processes and overcome civil designs’ challenges and complexities. Value engineering is a method experienced in management that has an organized approach. Value engineering has a systematic and cooperative mechanism to analyze function and systems with the aim of achieving desirable function with the least costs. This study has attempted to briefly introduce concepts and executive process of value engineering in construction projects. Also, the study has attempted to investigate conventional methods of evaluating projects function and compare them convergence with value engineering to improve projects. Based on the research findings, it can be found that if we can expect to achieve projects objectives by spending the least cost and ensure the efficacy of investment in construction projects management sector as a main challenge of development plans in the third world countries through using engineering in appropriate time periods and in different phases. |
Copyright: | © 2017 Kaveh Miladi Rad, Omid Aminoroayaie Yamini |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
0.68 MB
- Über diese
Datenseite - Reference-ID
10341162 - Veröffentlicht am:
14.08.2019 - Geändert am:
02.06.2021