0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 6, v. 23
Seite(n): 696-708
DOI: 10.1108/ecam-01-2016-0023
Abstrakt:

Purpose

The purpose of this paper is to present a way of working with open-standard building information modeling (BIM), object type libraries, systems engineering and an Information Delivery Manual for the management of information over the life-cycle of infrastructure assets. The concept is presented as a source of inspiration, proof of concept and to underpin the value of different parts of the concept leading to an integrated approach to life-cycle information management.

Design/methodology/approach

The paper presents a concept for a way of working. A proof of concept is provided in the form of a case study in which this concept is operational. It shows that this way of working using open-standard BIM can be applied to manage information in the life-cycle. It does not provide, nor suggest to provide, empirical evidence for specific benefits in terms of efficiency.

Findings

The paper shows that open-standard BIM can be applied for information management in the life-cycle of (construction) assets. The specific approach that is applied in practice in a Dutch Infrastructure Project is explained including a case project.

Research limitations/implications

The example of Traverse Dieren attests to a implementation of the approach in practice. From this case it can be concluded that the suggested approach is feasible in the initiation and design phase and applicable during realization. Based on the example as described in this paper it cannot be concluded to what extent the known information management problems in the life-cycle are solved. Therefore a detailed evaluation on the information exchange would be required which is beyond the scope of this paper.

Practical implications

This paper shows how different (theoretical) concepts are successfully combined and implemented in practice to attain the defined BIM goals.

Originality/value

This paper shows a practical case implementation of open-standard BIM (using COINS). It provides a way of working that combines BIM, systems engineering, libraries and contractual arrangements for the management of information over the life-cycle of infrastructure assets.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-01-2016-0023.
  • Über diese
    Datenseite
  • Reference-ID
    10576536
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine