0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Łazienkowski Bridge Fire in Warsaw – Structural Damage and Restoration Method

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Archives of Civil Engineering, , n. 4, v. 62
Seite(n): 171-186
DOI: 10.1515/ace-2015-0104
Abstrakt:

On the 14th of February, 2015, a huge fire broke out on Łazienkowski Bridge; a five span bridge, 423 m long and 28 m wide, built in the years 1972-74. It was a fully steel structure with four plate girders and orthotropic deck. The fire started under the first span during the replacement of wooden service decks. The next day, the Department of Bridges of the Warsaw University of Technology was designated to conduct an expertise material investigation, geometrical verification, and FEM model analysis. The subject of this paper concentrates on geometrical issues. The main difficulty of this task was the lack of full reference data regarding the bridge's original structure. The old design was incomplete and there was no actual surveying results for the undamaged structure. As a conclusion, some remarks focused on surveying measurements and on the final decision regarding this bridge are given. It was eventually exchanged into a brand new one and put into public use on the 28th of October, 2015.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1515/ace-2015-0104.
  • Über diese
    Datenseite
  • Reference-ID
    10476804
  • Veröffentlicht am:
    25.11.2020
  • Geändert am:
    25.11.2020
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine