0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Joint Detailing Between Double Tee Bridge Girders for Improved Serviceability and Strength

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 2592
Seite(n): 108-116
DOI: 10.3141/2592-12
Abstrakt:

Precast, prestressed double tee bridge girders are widely used for accelerated bridge construction on local roads in South Dakota. A common issue among double tee bridges in South Dakota is the rapid deterioration of longitudinal joints (shear keyways) between adjacent girders. Deteriorated joints allow moisture and deicing chemicals to reach the deck reinforcement, which leads to premature corrosion of reinforcing steel and spalling of concrete. The structural performance of conventional and proposed longitudinal joints between precast double tee bridge girders was examined experimentally under cyclic and monotonic loading. The proposed continuous joint with overlapping steel mesh reinforcement in a grouted shear keyway exhibited serviceability and strength performance characteristics substantially improved over those of the conventional grouted joint with discrete welded connections.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3141/2592-12.
  • Über diese
    Datenseite
  • Reference-ID
    10778023
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine