0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Jacking Construction and Measures for Jacking-up of Large Gradient Bridge

Autor(en):





Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Physics: Conference Series, , n. 1, v. 2424
Seite(n): 012019
DOI: 10.1088/1742-6596/2424/1/012019
Abstrakt:

Nowadays, more and more bridges are difficult to meet the traffic needs because of the limitations on bridge clearance height while bridge demolition and reconstruction will lengthen the construction cycle, waste a lot of resources, increase the construction cost, etc. By solving these problems and using the original bridge effectively, the bridge jacking-up construction technology is widely used. With the construction of urban road network, the original ramp bridge needs to be elevated to the new main road in the process of viaduct construction in Shanghai, which involves the slope adjustment of large gradient bridge. The jacking section of the bridge with 16.5m width deck and the total length 220.51m is divided into two sections with 19.51+24×3+19m and 19+24×3+19m span combinations. A series of measures are put forward for the bridge jacking construction: the ball-head Jacks are installed to offset Jack deflection, the sliding steel plate is used to ensure vertical and horizontal displacement of the Jack, the push-pull devices are installed to ensure the width of expansion joint while jacking-up and the fast-hardening concrete is proposed to use in the process of pier heightening.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1742-6596/2424/1/012019.
  • Über diese
    Datenseite
  • Reference-ID
    10777447
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine