0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Integrated priority decision index for risk assessment in chaos: cost overruns in transport projects

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 4, v. 27
Seite(n): 825-849
DOI: 10.1108/ecam-02-2019-0079
Abstrakt:

Purpose

Cost overrun is inherent to project chaos, which is one of the key drivers of project failure. The purpose of this paper is to explore the critical elements of complexity-risk interdependency for cost-chaos in the construction management domain by utilizing a multi-criteria decision model.

Design/methodology/approach

A total of 12 complexity and 60 risk attributes are initially identified from the literature and using expert’s judgements. For the development of a structured hierarchy of key complexity and risk drivers, a real-time Delphi process is adopted for recording and evaluating the responses from experts. Afterwards, a pair-wise comparison using analytical network processing is performed to measure complexity-risk interdependencies against cost alternatives.

Findings

The findings of the integrated priority decision index (IPDI) suggest that uncertainties related to contingency and escalation costs are the main sources of cost overrun in project drift, along with the key elements such as “the use of innovative technology,” “multiple contracts,” “low advance payment,” “change in design,” “unclear specifications” and “the lack of experience” appear to be more significant to chaos in complexity-risk interdependency network.

Research limitations/implications

This study did not address the uncertainty and vulnerability exit in the judgment process, therefore, this framework can be extended using fuzzy logic to better evaluate the significance of cost-chaos drivers.

Practical implications

These results may assist the management of cost overrun to avoid chaos in a project. The proposed model can be applied within project risk management practices to make better-informed technical decisions in the early phases of the project life cycle where uncertainty is high.

Originality/value

This research addresses the importance of cost overruns as a source of project chaos in dynamic systems where projects reach the edge of chaos and progress stops. A new IPDI index contributes toward evaluating the severity of complexity and risk and their interdependencies which create cost-chaos in infrastructure transport projects.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-02-2019-0079.
  • Über diese
    Datenseite
  • Reference-ID
    10576842
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine