Influence of Construction Period of Bridge Across Reservoir on Operation of Adjacent Power Station

Autor(en):










Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Stavební obzor - Civil Engineering Journal, , n. 3, v. 33
Seite(n): 345-355
DOI: 10.14311/cej.2023.03.0026
Abstrakt:

The influence of the construction period of the bridge project across the reservoir on the adjacent power station includes not only the direct impact on the hydropower hub but also the impacts on the reservoir area, flood discharge, power station head, water diversion and sediment prevention, power generation operation, and other factors. In this paper, from the aspects of the power station operation, an evaluation index for the influence of the construction period of a bridge across a reservoir on the adjacent power station is developed, and an evaluation system is constructed. Based on the constructed evaluation system, the influence of the bridge construction period on the adjacent power stations is analyzed. This evaluation system provides a reference for the impact assessment of cross-reservoir bridge engineering on adjacent hydropower stations.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.14311/cej.2023.03.0026.
  • Über diese
    Datenseite
  • Reference-ID
    10756483
  • Veröffentlicht am:
    08.01.2024
  • Geändert am:
    08.01.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine