Increasing the technology of waterproofing from bentonite mortars for construction, reconstruction and overall repair of a building
Autor(en): |
Elena Korol
Rima Petrosyan Nadezhda Smirnova |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | IOP Conference Series: Materials Science and Engineering, 1 Januar 2021, n. 1, v. 1030 |
Seite(n): | 012017 |
DOI: | 10.1088/1757-899x/1030/1/012017 |
Abstrakt: |
Subject: The article investigates the parameters of the technological processes of arranging underground injection waterproofing from bentonite solutions for construction, reconstruction, and overhaul of buildings in cramped conditions, taking into account the features of mechanization of work, the number and qualifications of workers. Based on the results of the timekeeping studies carried out in experimental conditions, the costs of working time for performing technological operations on the arrangement of underground waterproofing with an injection compound from bentonite solutions were determined. Considering the identified technological features, the number and qualifications of workers have been established during the work on the arrangement of injection waterproofing from bentonite solutions. |
- Über diese
Datenseite - Reference-ID
10674871 - Veröffentlicht am:
03.06.2022 - Geändert am:
03.06.2022