0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Implementation of Process-Based and Data-Driven Models for Early Prediction of Construction Time

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Advances in Civil Engineering, , v. 2019
Seite(n): 1-12
DOI: 10.1155/2019/7405863
Abstrakt:

The need of respecting the construction time as one of the construction contract elements points out that early prediction of construction time is of crucial importance for the construction project participants' business. Thus, having a model for early prediction of construction time is useful not only for the participants involved in the construction contracting process, but also for other participants in the construction project realization. Regarding that, this paper aims to present a hybrid method for predicting construction time in the early project phase, which is a combination of process-based and data-driven models. Five hybrid models have been developed, and the most accurate one was the BTC-GRNN model, which uses Bromilow's time-cost (BTC) model as a process-based model and the general regression neural network (GRNN) as a data-driven model. For evaluating the quality of the models, the 10-fold cross-validation method has been used. The mean absolute percentage error (MAPE) of the BTC-GRNN is 3.34% and the coefficient of determinationR², which reflects the global fit of the model, is 93.17%. These results show a drastic improvement of the accuracy in comparison to the model when only data-driven model (GRNN) has been used, where MAPE was 31.8% andR² was 75.64%. This model can be useful to the investors, the contractors, the project managers, and other project participants for construction time prediction in the early project phases, especially in the phases of bidding and contracting, when many factors, that can determine the construction project realization, are unknown.

Copyright: © 2019 Silvana Petruseva et al.
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10296145
  • Veröffentlicht am:
    27.01.2019
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine