The Impact of Schedule Compression Techniques on Construction Project Timelines: A Case Study in Basrah, Iraq

Autor(en): ORCID
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Open Civil Engineering Journal, , n. 1, v. 18
DOI: 10.2174/0118741495360335241205110710
Abstrakt:

Introduction

Project managers always compete to finish their projects on time. However, certain circumstances force them to use schedule compression techniques - such as activity crashing, overlapping, and method substitution, to address unplanned delays.

Methods

These techniques offer practical means to accelerate project timelines; however, their degree of effectiveness can vary widely across different projects and contexts. Nevertheless, such circumstances make compressing construction project schedules an important consideration for avoiding financial losses and protecting stakeholders' interests.

Results

The paper aims to evaluate the effect of schedule compression techniques on a construction project located in one of Basrah’s oil fields in Iraq. A case study approach is followed for discussing time-cost trade-offs, challenges, and outcomes with such techniques, including their financial implications, strategies for mitigating risks, and the management of resources.

Conclusion

The results provide insights that are useful in the optimisation of project schedules while ensuring that constraints for cost, safety, and operation are met.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.2174/0118741495360335241205110710.
  • Über diese
    Datenseite
  • Reference-ID
    10809477
  • Veröffentlicht am:
    17.01.2025
  • Geändert am:
    17.01.2025
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine