0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Identification of the Interference in the Investment Process During the Realization of a Shopping Centre – A Case Study

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Archives of Civil Engineering, , n. 1, v. 62
Seite(n): 159-172
DOI: 10.1515/ace-2015-0058
Abstrakt:

During the planning and controlling of the construction process, most attention is focused on risk analysis, especially in the context of final costs and deadlines of the investment. In this analysis, the primary and most significant concern is the proper identification and quantification of events, which on a certain level of probability may affect the development process. This paper presents the result of a risk analysis for a particular building object, made after completion of the investment and accepting it for use. Knowledge of the planned values and the actual investment process allowed for the identification of the events and their effects that in this case have significantly disrupted the investment process. The limited total cost of the investment project in question had a considerable impact on the progress of the project execution. Despite three transitions of administrative procedures, the opening date of the shopping centre was delayed by only three weeks.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1515/ace-2015-0058.
  • Über diese
    Datenseite
  • Reference-ID
    10476865
  • Veröffentlicht am:
    25.11.2020
  • Geändert am:
    25.11.2020
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine