0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Highway Bridge Construction Resource Equilibrium Based on Genetic Algorithm Optimization Research

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Physics: Conference Series, , n. 1, v. 2425
Seite(n): 012065
DOI: 10.1088/1742-6596/2425/1/012065
Abstrakt:

At present, highway and bridge projects in China are in full swing. In the process of multi project construction of highway and bridge, it is of great significance to study the project scheduling. On the basis of fully analyzing the specific characteristics of multi projects in highway and bridge construction, this paper studies the problem of “fixed duration resource balance (RB)” based on genetic algorithm (GA). Combined with the specific characteristics of multi projects in highway and bridge construction, it establishes an optimization model, and proposes the process of GA to solve the problem of multi RB in construction projects. When considering the multi project resource balance optimization (RBO) problem of highway and bridge construction, the GA is used to solve the problem. The results show that the model is effective for the multi project RB problem of highway and bridge construction. At the same time, it proves that it has great advantages to consider the RB of multiple projects of highway and bridge construction from the new perspective of resource scheduling cost.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1088/1742-6596/2425/1/012065.
  • Über diese
    Datenseite
  • Reference-ID
    10777445
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine