Highlights of the design and construction of a 12 km elevated APM bridge project in Saudi Arabia

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Concrete, , n. 3, v. 14
Seite(n): 250-259
DOI: 10.1002/suco.201200050
Abstrakt:

The automated people mover (APM) bridge project constructed at Princess Nora University (PNU) in Saudi Arabia and inaugurated in May 2012 is a major project with many challenges in design and construction due to its strict time-frame compared with the big scale of the project. Therefore, the design had to be such that it ensured simplicity, time-savings, lowest costs, aesthetics and the high quality required for bridge project elements. For aesthetic reasons, a box section was chosen for all the APM bridge sections for the bridge project, including straight, bifurcation and curved parts. This paper highlights the efficiency of the precast concrete techniques used in the design and construction of big projects such as this elevated APM bridge project at PNU in Saudi Arabia.

Stichwörter:
Brücken Hohlkasten Vorspannung
Verfügbar bei: Siehe Verlag

Bauwerke und Projekte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/suco.201200050.
  • Über diese
    Datenseite
  • Reference-ID
    10069266
  • Veröffentlicht am:
    15.12.2013
  • Geändert am:
    13.08.2014
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine