Genetic algorithm for determining the construction logistics of precast components
Autor(en): |
Yuan Fang
S. Thomas Ng |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Engineering, Construction and Architectural Management, Oktober 2019, n. 10, v. 26 |
Seite(n): | 2289-2306 |
DOI: | 10.1108/ecam-09-2018-0386 |
Abstrakt: |
PurposePrecast construction has become increasingly popular in the construction industry. Nonetheless, the logistics of construction materials has been a neglected topic, and this neglect has resulted in delays and cost overruns. Careful planning that considers all of the factors affecting construction logistics can ensure project success. The purpose of this paper is to examine the potential for using genetic algorithms (GAs) to derive logistics plans for materials production, supply and consumption. Design/methodology/approachThe proposed GA model is based on the logistics of precast components from the supplier’s production yard, to the intermediate warehouse and then to the construction site. Using an activity-based costing (ABC) approach, the model not only considers the project schedule, but also takes into account the production and delivery schedule and storage of materials. FindingsThe results show that Gas are suitable for solving time-cost trade-off problems. The optimization process helps to identify the activity start time during construction and the delivery frequency that will result in the minimal cost. What-if scenarios can be introduced to examine the effects of changes in construction logistics on project outcomes. Originality/valueThis paper presents a method for using Gas and an ABC approach to support construction logistics planning decisions. It will help construction planners and materials suppliers to establish material consumption and delivery schedules, rather than relying on subjective judgment. |
- Über diese
Datenseite - Reference-ID
10576871 - Veröffentlicht am:
26.02.2021 - Geändert am:
26.02.2021