0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Framework for productivity and safety enhancement system using BIM in Singapore

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 6, v. 24
Seite(n): 1350-1371
DOI: 10.1108/ecam-05-2016-0122
Abstrakt:

Purpose

Despite recognition of its importance to Singapore’s economy, the construction industry is plagued by poor safety and productivity performance. Improvement efforts by the government and industry have yielded little results. The purpose of this paper is to propose a framework for developing a productivity and safety monitoring system using Building Information Modelling (BIM).

Design/methodology/approach

The framework, Intelligent Productivity and Safety System (IPASS), takes advantage of mandatory requirements for building plans to be submitted for approval in Singapore in BIM format. IPASS is based on a study comprising interviews and a questionnaire-based survey. It uses BIM to integrate buildable design, prevention and control of hazards, and safety assessment.

Findings

The authors illustrate a development of IPASS capable of generating productivity and safety scores for construction projects by analysing BIM model information.

Research limitations/implications

The paper demonstrates that BIM can be used to monitor productivity and safety as a project progresses, and help to enhance performance under the two parameters.

Practical implications

IPASS enables collaboration among project stakeholders as they can base their work on analysis of productivity and safety performance before projects start, and as they progress. It is suggested that the BIM model submitted to the authorities should be used for the IPASS application.

Originality/value

IPASS has rule-checking, hazards identification and quality checking capabilities. It is able to identify hazards and risks with the rule-checking capabilities. IPASS enables practitioners to check mistakes and the rationality of a design. It helps to mitigate risks as there are built-in safety measures/controls rules to overcome the problems caused by design deficiency, wrong-material-choice, and more.

Geografische Orte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-05-2016-0122.
  • Über diese
    Datenseite
  • Reference-ID
    10576606
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine