Fourth industrialization-oriented offsite construction: case study of an application to an irregular commercial building

Autor(en):





Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 9, v. 27
Seite(n): 2271-2286
DOI: 10.1108/ecam-07-2018-0312
Abstrakt:

Purpose

This study, a research project, aims to examine the distinct characteristics of the Fourth Industrial Revolution (4IR), with a focus on construction. Following this examination, the paper presents a field study to evaluate the impact of the 4IR on the construction process.

Design/methodology/approach

The first half of this project is dedicated to defining the 4IR by reviewing existing literature. The other half of the project presents a case study to demonstrate the concept of the 4IR and measure the effect of its application. To validate the defined concept of the 4IR, the study focuses on the following: autonomous system for producing drawings and robotics in construction.

Findings

The intensive literature review revealed three unequivocal features of the 4IR: defined tasks, undefined tasks and improvement possibilities. The following case study showed that the incorporation of the three 4IR features resulted in improved productivity and efficiency during the construction of the podium for the Lotte World Tower. For example, the macro-based autonomous system achieved 5.52 shop drawings per hour, highlighting the potential impact of independent, autonomous machinery.

Originality/value

The originality of this project stems from its attempt to quantify the effectiveness of applying autonomous technologies to a practical project. While previous works in this field have focused on system development and improvement, this paper presents an autonomous system at work in an actual project, in which junior engineers were able to be entirely replaced. The system was successful in independently creating numerous required shop drawings. The value of this analysis is to generate scientific evidence to evaluate the efficacy of the adoption of 4IR-oriented technologies.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-07-2018-0312.
  • Über diese
    Datenseite
  • Reference-ID
    10576958
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine