0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Footbridge with Carbon-Fibre-Reinforced Polymers, Denmark

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 4, v. 9
Seite(n): 254-256
DOI: 10.2749/101686699780481808
Abstrakt:

In September 1999, a cable-stayed footbridge was opened to the public close to the railway station in Herning, Denmark. The footbridge is a key element in a research and development project regarding the use of new non-corrodible materials in bridge construction. All 16 cable stays are made of carbon-fibre-reinforced polymer (CFRP) cables, as are the six non-bonded post-tensioning tendons in the bridge deck. The reinforcement in half of the bridge deck consists of CFRP bars and stirrups. The reinforcement in the other part of the concrete deck is a combination of stainless steel (AISI 316) and conventional "black" reinforcement steel.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10003835
  • Veröffentlicht am:
    20.09.2002
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine