0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Failure Mechanism of Highly Stressed Rock Mass during Unloading Based on the Stress Arch Theory

Autor(en): (Professor, Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines, Northeastern Univ., Shenyang 110819, P. R. China.)
(Professor, Academician of Chinese Academy of Engineering, Intelligent Mine Research Center, Northeastern Univ., Shenyang 110819, P. R. China.)
ORCID (Ph.D. Candidate, Intelligent Mine Research Center, Northeastern Univ., Shenyang 110819, P. R. China (corresponding author))
(Master’s Candidate, Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines, Northeastern Univ., Shenyang 110819, P. R. China.)
(Master’s Candidate, Key Laboratory of Ministry of Education on Safe Mining of Deep Metal Mines, Northeastern Univ., Shenyang 110819, P. R. China.)
(Lecturer, College of Resource and Civil Engineering, Northeastern Univ., Shenyang 110819, P. R. China.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: International Journal of Geomechanics, , n. 11, v. 18
Seite(n): 04018146
DOI: 10.1061/(asce)gm.1943-5622.0001280
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)gm.1943-5622.0001280.
  • Über diese
    Datenseite
  • Reference-ID
    10605979
  • Veröffentlicht am:
    08.05.2021
  • Geändert am:
    08.05.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine