Factors Affecting Sustainability Performance during the Construction Stage in Building Projects-Consultants’ Perspective
Autor(en): |
Bassam A. Tayeh
Yazan I. Abu Aisheh Ibrahim O. Abuzuhri |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | The Open Construction and Building Technology Journal, 18 Februar 2020, n. 1, v. 14 |
Seite(n): | 17-26 |
DOI: | 10.2174/1874836802014010017 |
Abstrakt: |
Background:The construction industry significantly contributes towards enriching human inhabitation within the built environment. However, the industry generates one-third of the world’s carbon emissions per annum (a major contributor to climate change). In response, a sustainable construction development agenda has been propagated by governments worldwide. Objective:This research investigates the factors affecting sustainability performance during the construction stage of building projects in the Gaza Strip from consultants’ viewpoint. Methods:A questionnaire was distributed to 35 consultants, and 31 completed questionnaires were returned, representing a response rate of 88.57%. A total of 55 variables were considered in this study and listed within three thematic factor groups, namely, economic, social and environmental factors. Data collected were analysed using factor analysis and relative important index within the Statistical Package for the Social Sciences (v22). Results:Results indicated that the most influential factors are i)Economic:professional fees of engineers and consultants, energy cost and use of full equipment capacity; ii)Social:availability of knowledge and skills in the labour force, increased burden on infrastructure as a result of the use and depletion of natural resources and public awareness; and iii)Environmental:environmental regulations, pollution generation and waste generation. Conclusion:Lack of awareness about economic and social sustainability was found due to the traditional definition of environmental sustainability and the upper and indirect super-vision of consultants to the construction stage. |
Copyright: | © 2020 Bassam A. Tayeh, Yazan I. Abu Aisheh, Ibrahim O. Abuzuhri |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
0.8 MB
- Über diese
Datenseite - Reference-ID
10414514 - Veröffentlicht am:
26.02.2020 - Geändert am:
02.06.2021