Evaluation of Cracks in a Spliced, Prestressed Concrete I-Girder Bridge

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Transportation Research Record: Journal of the Transportation Research Board, , n. 1, v. 2313
Seite(n): 83-91
DOI: 10.3141/2313-09
Abstrakt:

The purpose of the investigation reported in this paper was to identify the main causes of cracking that occurred in the Cross Florida Barge Canal Bridge, a three-span, continuous, spliced I-girder bridge that comprises spans of 77.7–86.9–77.7 m (255–285–225 ft) located in Citrus County, Florida. This paper briefly describes the bridge and the cracking. It then presents analytical models. Analytical results showed that the maximum vertical tensile force within a girder end zone from longitudinal prestressing strands was nearly 8% of the total prestressing force. The force was significantly higher than that prescribed by AASHTO specifications to determine the quantity of vertical reinforcement required at the ends of pretensioned members. Finally, the paper discusses some recommendations for end zone detailing. The results could help bridge designers provide better bridge detailing and further mitigate cracking in prestressed, spliced I-girders.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3141/2313-09.
  • Über diese
    Datenseite
  • Reference-ID
    10778101
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine