Enterprise’s Risk Assessment Of Complex Construction Projects
Autor(en): |
J. Konior
|
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Archives of Civil Engineering, September 2015, n. 3, v. 61 |
Seite(n): | 63-74 |
DOI: | 10.1515/ace-2015-0025 |
Abstrakt: |
The purpose of this article is to present the preparation of Project Risk Assessment Methodology and its mitigation in complex construction projects. The main text provides a summary of the approach, the method used and the findings. The conclusions have been drawn that the proper tools for quantifying risks have to be based on the criteria specific for mathematical statistic and probability or at least fuzziness. Function, which makes possible to categorize any risks into one of the five categories, is a combination of probability and the impact on one of the items: people and their safety or budget, cost, schedule and planning or quality and performance. An attempt was made to express numerically the relationship between risks impacts and their level of likelihood. Also, a method of associating the influence of projects risks impacts on the extent of the likelihood of project risk occurrence which makes possible to determine the direction and the strength of this relationship was presented. |
- Über diese
Datenseite - Reference-ID
10476899 - Veröffentlicht am:
25.11.2020 - Geändert am:
25.11.2020