Displacements ahead of an advancing NATM tunnel in the London clay

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Géotechnique, , n. 9, v. 53
Seite(n): 767-784
DOI: 10.1680/geot.2003.53.9.767
Abstrakt:

This paper reports the results of monitoring carried out to study the patterns of ground displacement that develop ahead of an advancing sprayed concrete lined tunnel in soft ground. Extensive instrumentation was installed and monitored during the construction of the Heathrow Express platform tunnels forming part of the underground station at London Heathrow's Terminal 4. The construction of the concourse tunnel, built between the two completed platform tunnels, provided the opportunity to install additional instrumentation ahead of the tunnel drive, and to measure ground movements as the tunnel approached the instrumented sections. The paper describes the ground conditions at Heathrow, and the method of construction used for the concourse tunnel. The performance of the instrumentation and the pattern of ground displacements measured are reported. Finally, a synthesis of ground displacements measured is given, and the results are compared with the volume loss recorded during the concourse tunnel construction.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1680/geot.2003.53.9.767.
  • Über diese
    Datenseite
  • Reference-ID
    10674107
  • Veröffentlicht am:
    29.05.2022
  • Geändert am:
    29.05.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine