Determining Concessionary Items for “availability Payment Only” Ppp Projects: a Holistic Framework Integrating Value-for-money and Social Values

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Civil Engineering and Management, , n. 2, v. 30
Seite(n): 149-167
DOI: 10.3846/jcem.2024.20841
Abstrakt:

Public-private partnerships (PPPs) have been widely applied in infrastructure development around the world. However, reasonable concessionary items are critical to compromise interest conflicts between government agencies and sponsors to ensure project success. A broad literature review centering on PPP transaction structuring revealed two significant research gaps: (1) a lack of attention to the ‘availability payment only’ (APO) funding method and (2) negligence of the public side’s perspective in determining concessionary items. The research objective was to develop a methodological framework for determining concessionary items in APO PPP projects while considering the interests of the public side. This study proposed a value-for-money (VFM) and social values integrated framework which accommodates discounted cash flow (DCF) analysis, bargaining game modeling, and multi-objectives decision-making (MODM). This framework enables a decision-making process based on both an indifferent feasible interval of concessionary items under a discount rate agreed upon by both parties and an optimal set of concessionary items. Additionally, results of a sensitivity analysis indicated that project construction profit can significantly affect feasible and optimal concession items, and the optimal concession period is less sensitive to changes in risk allocation. The application of proposed model indicated that this paper successfully provides a methodology for determining a feasible interval and an optimal concession items group tailored to APO PPP projects. This study paves the way towards a platform for the public and private partners to jointly and quickly come up with sound PPP concessional items in light of the win-win principle, particularly under the APO funding mechanism.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3846/jcem.2024.20841.
  • Über diese
    Datenseite
  • Reference-ID
    10774185
  • Veröffentlicht am:
    29.04.2024
  • Geändert am:
    29.04.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine