Determine the optimal capital structure of BOT projects using interval numbers with Tianjin Binhai New District Metro Z4 line in China as an example

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 7, v. 26
Seite(n): 1348-1366
DOI: 10.1108/ecam-07-2018-0259
Abstrakt:

Purpose

Various factors may influence project finance when a multi-sourced debt financing strategy is used for financing capital investments, in general, and public infrastructure investments, in particular. Traditional indicators lack comprehensive consideration of the influences of many internal and external factors, such as investment structure, financing mode and credit guarantee structure, which exist in the financing decision making of BOT projects. An effective approach is, thus, desired. The paper aims to discuss these issues.

Design/methodology/approach

This paper develops a financial model that uses an interval number to represent the uncertain factors and, subsequently, conducts a standardization of the interval number. Decision makers determine the weight of each objective through the analytic hierarchy process. Through the optimization procedure, project investors and sponsors are provided with a strategy regarding the optimal amount of debt to be raised and the insight on the risk level based on the net present value, as well as the probability of bankruptcy for each different period of debt service.

Findings

By using an example infrastructure project in China and based on the comprehensive evaluation, comparison and ranking of the capital structures of urban public infrastructure projects using the interval number method, the final ranking can help investors to choose the optimal capital structure for investment. The calculation using the interval number method shows that X2 is the optimal capital structure plan for the BOT project of the first stage of Tianjin Binhai Rail Transit Z4 line. Therefore, investors should give priority to selecting a capital contribution ratio of 45 per cent for this investment.

Research limitations/implications

In this paper, some parameters, such as depreciation life, construction period and concession period, are assumed to be deterministic parameters, although the interval number model has been introduced to analyze the uncertainty indicators, such as total investment and passenger flow, of BOT rail transport projects. Therefore, more of the above deterministic parameters can be taken as uncertainty parameters in future research so that calculation results fit actual projects more closely.

Originality/value

This model can be used to make the optimal investment decision for a project by determining the impact of uncertainty factors on the profitability of the project in its lifecycle during the project financial feasibility analysis. Project sponsors can determine the optimal capital structure of a project through an analysis of the irregular fluctuation of the unpredictable factors in project construction such as construction investment, operating cost and passenger flow. The model can also be used to examine the effects of different capital investment ratios on indicators so that appropriate measures can be taken to reduce risks and maximize profit.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-07-2018-0259.
  • Über diese
    Datenseite
  • Reference-ID
    10576790
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine