Design according to MC2010 of a fibre-reinforced concrete tunnel in Monte Lirio, Panama
Autor(en): |
Angelo Caratelli
Alberto Meda Zila Rinaldi |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Structural Concrete, September 2012, n. 3, v. 13 |
Seite(n): | 166-173 |
DOI: | 10.1002/suco.201100034 |
Abstrakt: |
This paper discusses the possibility of using precast tunnel segments in fibre-reinforced concrete without traditional reinforcement. The case study of a hydraulic tunnel in Monte Lirio, Panama, excavated with a tunnel boring machine (TBM) by SELI S.p.A., has been analysed. |
Verfügbar bei: | Siehe Verlag |
- Über diese
Datenseite - Reference-ID
10067662 - Veröffentlicht am:
29.03.2013 - Geändert am:
13.08.2014