0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Green Building, , n. 3, v. 9
Seite(n): 151-162
DOI: 10.3992/1943-4618-9.3.151
Abstrakt:

This paper identifies the dilemma faced by the stakeholders of existing buildings in regards to a decision making process for energy retrofitting. This paper also identifies the missing stage viewed as the “integrity audit “which can lead to substantial savings in the area of building operation. The methodology is centered on identifying energy waste first, reducing the overall peak electrical demand and then retrofitting for energy-efficiency. A proposed “integrity audit” leads to the classification of three main energy culprits: the identification of waste, missed opportunities, and rescheduling the operation of equipment use. A case study indicating the financial advantages of applying this methodology for a commercial building are presented. The energy retrofitting strategy is divided into two main categories, namely building control improvements and building component implementation. The payback periods are often within months if not immediate.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.3992/1943-4618-9.3.151.
  • Über diese
    Datenseite
  • Reference-ID
    10516818
  • Veröffentlicht am:
    11.12.2020
  • Geändert am:
    19.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine