Critical success factors for implementation of risk assessment and management practices within the Tanzanian construction industry

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 3, v. 21
Seite(n): 291-319
DOI: 10.1108/ecam-01-2013-0001
Abstrakt:

Purpose

Despite the extensive research on critical success factors (CSFs), there is a paucity of studies that examine CSFs for the deployment of risk assessment and management processes in developing countries, particularly, Africa. The purpose of this paper is to investigate the perception of construction professionals on CSFs appertaining to the deployment of risk assessment and management practices (RAMP) in Tanzania with the aim of filling the knowledge gap.

Design/methodology/approach

The primary data were collected from 67 construction professionals working with clients (private and public), consultants, and contractor organisations (foreign and local) within the Tanzanian construction. Response data was subjected to descriptive and inferential statistics with one-way analysis of variance to examine the differences in the perception of the identified CSFs.

Findings

The descriptive and empirical analysis demonstrated a disparity of the ranking of the ten CSFs among the groups; however, the differences were not significant. Based on the overall sample, the results of the mean score ranking indicate that “awareness of risk management processes”; “team work and communications”; and “management style” were the three highly ranked CSFs whereas “co-operative culture”; “customer requirement”; and “positive human dynamics” were considered to be the least important.

Research limitations/implications

The study did not differentiate the perceptions of the CSFs according to the ownership (local or foreign), and the sample consisted of organisations in one industry operating in Tanzania. Consequently, the findings may not generalise to other industries or to organisations operating in other countries.

Practical implications

For RAMP to be implemented effectively, Tanzanian constructional-related organisations should consider the identified CSFs as a vehicle for improving project success through reduction of risk uncertainty. Furthermore, regardless of the type of organisation, “management style”, “team work and communication” are necessary for the successful deployment of RAMP.

Originality/value

This study makes a contribution to the body of knowledge on the subject within a previously unexplored context. The study provides insights on the drivers and enablers (CSFs) of risk assessment implementation across the Tanzania construction sector.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-01-2013-0001.
  • Über diese
    Datenseite
  • Reference-ID
    10576427
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine