One of the common methods used to install pile foundation is hydraulic jacked-in machine. In this method, a pile is pushed down into the ground up to the predetermined depth. The method has similar principle to that of Cone Penetration Test (CPT). This paper presents the correlation between the mobilize pressure required to install pile foundations and that required to push the bi-cones that attached at the tip of CPT rod. The results show that the penetration pressure required to install the pile into very soft clay layer is independent of pile diameter. The penetration pressure required to install the pile into soft to stiff clay layers depends on the pile diameter. The larger the diameter of piles, the smaller the penetration pressures required. The penetration pressure required to install the pile into stiff expansive clay layer beyond the depth of active zone can be predicted as high as the pressure calculated form CPT. |
Copyright: | © All right reserved 2019. Civil Engineering Dimension |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 3.0 (CC-BY 3.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
0.4 MB
- Über diese
Datenseite - Reference-ID
10322260 - Veröffentlicht am:
12.07.2019 - Geändert am:
02.06.2021