Contributing Cost Variation Factors in Highway Projects
Autor(en): |
Samiullah Sohu
Abd Halid Abdullah Sasitharan Nagapan Ashfaque Ahmed Jhatial Muhammed Tahir |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Civil Engineering Journal, August 2018, n. 8, v. 4 |
Seite(n): | 1793 |
DOI: | 10.28991/cej-03091115 |
Abstrakt: |
Cost overrun is known as when the final cost of any project surpasses the sectioned cost of the project at the floating of tender. Cost overrun or cost variation overrun is the main problem in the construction of highway projects in Sindh Province of Pakistan. To attain the main objective of the research a literature review was conducted and 64 general factors of cost overrun were found in construction industry. A questionnaire was developed and distributed among 28 well experienced experts having maximum experience in construction of building projects. Gathered data was analyzed by method of average index. Results shows that main and causative factors of cost variation were financial and cash issues faced by owner, slow information between parties, change in price of material, delay of design, poor site management, payment and financial issues problem faced by the contractor and delay in decision making. This research can help petitioners of highway projects to overcome these main and causative factors of cost. |
Copyright: | © 2018 Samiullah Sohu, Abd Halid Abdullah, Sasitharan Nagapan, Ashfaque Ahmed Jhatial, Muhammed Tahir |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
0.5 MB
- Über diese
Datenseite - Reference-ID
10340949 - Veröffentlicht am:
14.08.2019 - Geändert am:
02.06.2021