Contracting for Road Maintenance in the Netherlands—the Downside of Performance-based Contracting
Autor(en): |
Gelderman
Semeijn Vries |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Infrastructures, August 2019, n. 3, v. 4 |
Seite(n): | 41 |
DOI: | 10.3390/infrastructures4030041 |
Abstrakt: |
A trend towards performance-based contracting (PBC) can be observed in public infrastructure maintenance. PBC is an approach of tying the contractor’s payment to specified performance. We investigated PBC for the maintenance of highways and roads in the Netherlands, identifying issues ultimately resulting in poor contractor performance. The PBC-induced risks for clients relate to the problematic translation and measurement of specifications, the ineffectiveness of incentives, the avoidance of contractors taking full responsibility, and contract management issues. Clients should recognize the actual balance of power in the relationship with their (main) contractors, and take appropriate measures. |
Copyright: | © 2019 the Authors. Licensee MDPI, Basel, Switzerland. |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
0.48 MB
- Über diese
Datenseite - Reference-ID
10723277 - Veröffentlicht am:
22.04.2023 - Geändert am: