0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Construction System Reliability Analysis Based on Improved Firefly Algorithm

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Open Civil Engineering Journal, , n. 1, v. 10
Seite(n): 189-199
DOI: 10.2174/1874149501610010189
Abstrakt:

To solve the problems of multi-objective control, objective quantification difficulties and computational complexity existing in the construction management, the construction system reliability was introduced into the project management. The process of construction project was divided into several units of work based on system decomposition theory. And the reliability of each unit of work was calculated. Then, the system reliability was optimized by the improved firefly algorithm. To avoid that the basic algorithm is highly depended on the initial solution and easy to fall into local optimum at later stage, the dynamic population firefly algorithm was proposed. Engineering practice shows that the improved algorithm has higher convergence speed and accuracy of optimization. The study provides a novel method for effective construction management.

Copyright: © 2016 Yancang Li et al.
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10175406
  • Veröffentlicht am:
    30.12.2018
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine