Construction project planning and scheduling as a dynamic system: a content analysis of the current status, technologies and forward action

Autor(en): ORCID


ORCID

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Smart and Sustainable Built Environment, , n. 4, v. 11
Seite(n): 972-995
DOI: 10.1108/sasbe-02-2021-0022
Abstrakt:

Purpose

Dynamic planning and scheduling forms a widely adopted smart strategy for solving real-world problems in diverse business systems. This paper uses deductive content analysis to explore secondary data from previous studies in dynamic planning and scheduling to draw conclusions on its current status, forward action and research needs in construction management.

Design/methodology/approach

The authors searched academic databases using planning and scheduling keywords without a periodic setting. This research collected secondary data from the database to draw an objective comparison of categories and conclusions about how the data relates to planning and scheduling to avoid the subjective responses from questionnaires and interviews. Then, applying inclusion and exclusion criteria, we selected one hundred and four articles. Finally, the study used a seven-step deductive content analysis to develop the categorisation matrix and sub-themes for describing the dynamic planning and scheduling categories. The authors used deductive analysis because of the secondary data and categories comparison. Using the event types represented in a quadrant mapping, authors delve into where, when, application and benefits of the classes.

Findings

The content analysis showed that all the accounts and descriptions of dynamic planning and scheduling are identifiable in an extensive research database. The content analysis reveals the need for multi-hybrid (4D BIM-Agent based-discrete event-discrete rate-system dynamics) simulation modelling and optimisation method for proffering solutions to scheduling and planning problems, its current status, tools and obstacles.

Originality/value

This research reveals the deductive content analysis talent in construction research. It also draws direction, focuses and raises a question on dynamic planning and scheduling research concerning the five-integrated model, an opportunity for their integration, models combined attributes and insight into its solution viability in construction.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/sasbe-02-2021-0022.
  • Über diese
    Datenseite
  • Reference-ID
    10779771
  • Veröffentlicht am:
    12.05.2024
  • Geändert am:
    12.05.2024
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine