0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Case Study on Passive Heat Compensation Tower of Ground-Source Heat-Pump System

Autor(en): (Ph.D. Candidate, State Environmental Protection Key Laboratory of Eco-Industry, Northeastern Univ., Shenyang 110819, China.)
(Undergraduate Student, State Environmental Protection Key Laboratory of Eco-Industry, Northeastern Univ., Shenyang 110819, China.)
(Postgraduate Student, School of Municipal and Environment Engineering, Shenyang Jianzhu Univ., Shenyang 110168, China.)
(Postgraduate Student, School of Municipal and Environment Engineering, Shenyang Jianzhu Univ., Shenyang 110168, China.)
(Professor, State Environmental Protection Key Laboratory of Eco-Industry, Northeastern Univ., Shenyang 110819, China (corresponding author).)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Energy Engineering, , n. 6, v. 145
Seite(n): 05019002
DOI: 10.1061/(asce)ey.1943-7897.0000629
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)ey.1943-7897.0000629.
  • Über diese
    Datenseite
  • Reference-ID
    10588709
  • Veröffentlicht am:
    08.03.2021
  • Geändert am:
    08.03.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine