Case study of "project controlling" on a large HOPSCA project in China

Autor(en):



Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 6, v. 24
Seite(n): 862-874
DOI: 10.1108/ecam-07-2015-0118
Abstrakt:

Purpose

The purpose of this paper is to present a detailed case study on the methods and organisational structure used for controlling the time schedule for a large and complex project. The paper discusses the use of “project controlling”, a term used to describe project control by a third-party organisation.

Design/methodology/approach

The researchers used action research to collect data for the case study. A member of the research team was a “participant-observer” on the project on a day-to-day basis for a period of 18 months collecting and analysing data which were subsequently analysed by a mixed methods approach.

Findings

The use of a “Project Controlling Unit” operated by an independent adviser organisation has significant advantages over traditional methods. It can provide timely, consolidated, independent guidance to the client and assistance to other participating organisations.

Research limitations/implications

The research has confirmed the effectiveness of the method on the project under study.

Practical implications

The findings provide guidance for enhanced project control on large complex infrastructural projects that will be of interest to other researchers, other clients and other construction organisations both within China and internationally.

Social implications

Organisations that seek to develop Project Controlling Units to implement the methods described in this paper will need to review their recruitment and training strategies to ensure that appropriate and experienced staffs are engaged.

Originality/value

The paper extends the knowledge relating to “project controlling” method. The findings provide additional insights to progress reporting and the management of construction production on HOPSCA and other large infrastructural projects.

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-07-2015-0118.
  • Über diese
    Datenseite
  • Reference-ID
    10576596
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    29.05.2022
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine