0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):




Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Concrete, , n. 3, v. 15
Seite(n): 281-291
DOI: 10.1002/suco.201400024
Abstrakt:

This article explains the process of developing a new method, called the balanced lift method, for constructing bridges based on an alternative to the bridge construction techniques used nowadays. The most common methods of building bridges are those using falsework or the cantilever method, but a rather uncommon method, the lowering of arches is seen as the origin of the balanced lift method. The idea was to create a method that would allow a bridge to be built in a very fast manner without the need for falsework, using prefabricated elements and assembling all parts together in a position - in this case vertically - that would simplify the construction process. In order to reach the final state of the bridge, the parts assembled vertically are rotated into their final horizontal position. This article contains descriptions of the development of the method, a large-scale test and two bridges already designed using the balanced lift method.

Stichwörter:
Brückenbauverfahren
Verfügbar bei: Siehe Verlag

Bauwerkstypen

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1002/suco.201400024.
  • Über diese
    Datenseite
  • Reference-ID
    10070490
  • Veröffentlicht am:
    07.10.2014
  • Geändert am:
    04.02.2015
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine