0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Autor(en):
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Structural Engineering International, , n. 4, v. 15
Seite(n): 208-211
DOI: 10.2749/101686605777962946
Abstrakt:

The Central Artery in Boston, Massachusetts, known locally as the 'Big Dig', is a landmark project in urban infrastructure redevelopment. It was vital to minimise the disruption during construction. The tunnel jacking, which provided a key solution to this need, is by far the largest and most complex project of its kind in the world. Well over ten times the size of any jacked tunnels attempted in the USA before, it has involved a wide range of innovation. The tunnel jacking has delivered a low maintenance, robust construction while bringing important environmental benefits and contributed to over US$300 million in construction savings. The project has strongly demonstrated that, for particular spatial and operational constraints, tunnel jacking can provide the best overall value and performance in creating new infrastructure.

Bauwerke und Projekte

  • Über diese
    Datenseite
  • Reference-ID
    10029035
  • Veröffentlicht am:
    18.08.2007
  • Geändert am:
    28.10.2016
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine