Bidding Strategy in Construction Public Procurement: A Contractor’s Perspective
Autor(en): |
Tomáš Hanák
Adriana Drozdová Ivan Marović |
---|---|
Medium: | Fachartikel |
Sprache(n): | Englisch |
Veröffentlicht in: | Buildings, 20 Januar 2021, n. 2, v. 11 |
Seite(n): | 47 |
DOI: | 10.3390/buildings11020047 |
Abstrakt: |
A contractor’s ability to prepare a competitive bid for a construction tender is crucial for its survival on the market. The bid price estimation strategy should promote the probability of winning a sufficient amount of tenders but, at the same time, ensure the economic stability and development of the company. This paper aims to address this issue in the area of Czech public construction procurement. The opinions, experiences and practices of contractors were collected through a questionnaire survey, and the data were evaluated with the support of statistical methods. This revealed that Czech contractors mostly base their multicriteria bidding strategy on cost-oriented pricing while considering various aspects such as the risks and attractiveness of the tender. The Czech construction market is generally perceived as oriented toward low costs, and with a relatively common occurrence of abnormally low bids. The findings presented in this paper may help contractors improve their current bidding strategies in public construction procurement. |
Copyright: | © 2021 by the authors; licensee MDPI, Basel, Switzerland. |
Lizenz: | Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden. |
0.83 MB
- Über diese
Datenseite - Reference-ID
10560761 - Veröffentlicht am:
03.02.2021 - Geändert am:
02.06.2021