0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Bid or no-bid decision factors of indigenous contractors in Nigeria

Autor(en):


Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Engineering, Construction and Architectural Management, , n. 3, v. 24
Seite(n): 378-392
DOI: 10.1108/ecam-01-2016-0029
Abstrakt:

Purpose

The decision to bid or not to bid for new projects determines contractors’ propensity for business success or failure. The purpose of this paper is to investigate the factors that affect the decision of indigenous construction contractors to bid or not to bid in Nigeria.

Design/methodology/approach

Analysis was conducted on data from questionnaires received from 64 engineering management employees of leading construction companies which are members of Nigeria’s Federation of Construction Industry. The study identified 41 significant decision factors often considered by Nigerian indigenous contractors before the bid. Mean item scores were obtained for each of the factors. Principal component analysis was used to point out the most significant decision factors.

Findings

Results revealed significant orthogonal relationships between the factors. Only 11 of the 41 factors are statistically significant to influence contractors’ decision to bid or not to bid. Most of the significant items were amongst the least rated items by the participants. Thepost hocdecision factors include consultant’s interpretation of project specifications, previous relationship between the intending bidder and client, availability of other projects at the time of bidding, technological complexity of the project under consideration and prequalification requirements. Others include the propensity for resource price fluctuation, business capacity of partners, amount of own work vs subcontracted work, required rate of return on investment and difficulty in obtaining finance.

Originality/value

The practical implication of these findings are as follows: the orthogonal relationship between the decision factors implies non-linear relationship between the factors and actual decision to bid or not to bid, and that bid success is often not predictable by bid behaviour; many of the bid decision factors rated highest by indigenous contractors seldom impact the contractors’ actual bid decisions; local and international players can adopt the significant decision factors elicited in this study for managing their structures for inter-organizational partnerships.

Geografische Orte

Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1108/ecam-01-2016-0029.
  • Über diese
    Datenseite
  • Reference-ID
    10576564
  • Veröffentlicht am:
    26.02.2021
  • Geändert am:
    26.02.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine